Friday, March 27, 2015

Rail work and a surprise

The rail crew managed to lay both the main and siding through Malta Yard today.  Their day ended shortly after lunch though when they ran out of switches.


Not to long after the rail crew packed up and left, this rail fan was surprised by the first Westbound on the line.  With more than ample power (SD40T-2 5405, SP SD40T-2 8521, SD50 5504) for this abbreviated auto-rack train I barely had enough time to snap these pictures before the train was out of site and in run 8 to the summit at Tennessee Pass.
From D&RGW's Tennessee Pass


From D&RGW's Tennessee Pass

No comments:

Post a Comment